Once upon a time...

Once upon a time...
Christmas 2016

Wednesday 6 May 2009

Camper Days 4 to 5: Clearing the decks

If you haven't been following from the beginning, this camper build starts with Camper Day 1: The adventure begins, or if you just want to see the previous post, have a look at Camper Day 3: Making Space.

The last few evenings after work have been spent unpacking the caravan bits and storing them in the garage.

This was then followed by stripping the various ambulance fixtures and fittings out of the rear. These comprised a number of brackets, some cupboards and seat backs, etc.

As can be seen, the rear seat still remains and the Eberspacher (diesel powered heater) is still in place. I'm leaving the heater connected as I am not currently inclined to be messing with the fuel line and I want it fitted anyway. I will however later remove it as the entire floor will be recovered as part of the build.

Photobucket Photobucket Photobucket Photobucket

No comments:

Post a Comment